Real projects delivered across London.

Carpentry

Framing, paneling, and second-fix finishing.

17 photos

Curved oak wall paneling in a commercial corridor with terrazzo floor — Takeair Ltd carpentry London

Carpentry

Framing, paneling, door hanging, and second-fix finishing.

Timber stud partitions, decorative wall cladding, fitted carpentry, and precise second-fix work for commercial fit-outs and residential schemes across London.

View all photos Close gallery
Timber stud partition — close-up of fresh-cut vertical posts in a new-build shell
Curved oak wall paneling in a commercial corridor with terrazzo floor
Carpenter in high-vis cutting architrave on a DeWalt mitre saw during a residential fit-out
Modern office with vertical timber slat wall paneling, glass partition, and flush grey door
3D staggered timber block feature wall cladding — decorative carpentry installation
Carpenter sawing timber on a sawhorse at an outdoor construction site with roof frame behind
Two operatives using nail guns on OSB sheets — structural carpentry works
Timber stud partition frame with door opening formed in a residential new-build interior
Close-up of a precision dovetail corner joint in structural timber carpentry
New-build roof deck — timber joists and OSB sheeting viewed from scaffold level
Completed dark commercial reception with timber slat feature wall, LED strip lighting, and plants
Carpenter's hands fitting a mitred skirting corner joint — second-fix finishing detail
Drylining work on a commercial fit-out — Takeair Ltd drylining London

Drylining & Fixing

Metal stud partitions, plasterboard, and suspended ceilings.

Commercial and residential drylining from metal stud framing and boarding through to taped, filled, and ready-to-decorate partitions and ceilings.

View all photos Close gallery
Drylining — metal stud partitions and plasterboard fitting on a commercial site
Large copper pipe runs along the ceiling of a multi-storey commercial building — Takeair Ltd plumbing London

Plumbing

First fix, commercial pipework, and plant room installations.

Copper pipework first fix, commercial plant rooms, distribution manifolds, and large-scale pipe runs for commercial buildings and residential schemes across London.

View all photos Close gallery
Neat copper first fix pipework on a block wall — horizontal and vertical runs
Industrial riser duct with large red and copper pipes running along brick walls
Complex copper pipe assembly — multiple bends and joints rising vertically in a plant area
First fix copper pipework running below floor joists in a residential frame before boarding
Commercial plant room with large insulated pipework, blue valves, and pressure gauges
Copper pipe manifold and distribution board on OSB backing — multiple circuits neatly arranged
Commercial plant room with copper and steel pipework and a large red heat exchanger unit
Large copper pipe runs along the ceiling of a multi-storey commercial building alongside cable trays
Commercial boiler room — complex pipework installation with large vessels and boilers
Decorative fluted travertine wall tiles with dark marble slab floor — high-end tiling by Takeair Ltd London

Tiling

Wall and floor tiling for commercial and residential spaces.

Large-format floor tiling, decorative wall tiles, levelling systems, and precision finishing for commercial fit-outs, bathrooms, kitchens, and reception areas across London.

View all photos Close gallery
Decorative fluted travertine wall tiles with dark marble slab floor — high-end interior tiling
Tiler in red gloves cutting and laying grey floor tiles at a wall junction
Completed large-format grey porcelain floor tiling in a commercial space
Tiler in red shirt applying notched trowel adhesive for large format floor tile installation
Tiler levelling large format floor tiles using suction pad and spirit level
Large white marble-effect floor tiles being set with a levelling clip system and piston gun
Tiler's hand placing small white 3D brick-effect wall tiles with cross spacers
Finished cream travertine-effect floor tiles in a kitchen — completed tiling works London
Tiler applying notched trowel adhesive for floor tile installation in progress
Tiler in hi-vis kneeling and levelling floor tiles with spacers at a wall junction
Tiler in hi-vis applying adhesive and setting floor tiles on an under-construction floor
Tiler laying terracotta-tone floor tiles using trowel and spacers
Underfloor heating pipes laid on insulation — Takeair Ltd UFH London

Underfloor heating

Wet UFH systems installed as part of M&E and plumbing packages.

Pipe layout, manifold installation, zone planning, pressure testing, and screed coordination for residential and commercial underfloor heating systems across London.

View all photos Close gallery
Underfloor heating pipe loops on insulation board in a new-build room
Aerial view of UFH pipe loops covering a whole floor plan
Ductwork installation — rectangular and spiral ducting for ventilation and extract systems by Takeair Ltd London

Ductwork install

Rectangular and spiral ductwork, extract systems, and ventilation installations.

Full HVAC ductwork packages: rectangular and circular ducting, extract hoods, kitchen extract, ventilation runs, and plant-room connections for commercial fit-outs across London.

View all photos Close gallery
Ductwork installation project 1
Ductwork installation project 2
Ductwork installation project 3
Ductwork installation project 4
Ductwork installation project 5
Ductwork installation project 6
Ductwork installation project 7
Ductwork installation project 8
Ductwork installation project 9
Ductwork installation project 10
Ductwork installation project 11
Ductwork installation project 12
Ductwork installation project 13
Ductwork installation project 14
Ductwork installation project 15
Ductwork installation project 16
Ductwork installation project 17
Ductwork installation project 18
Ductwork installation project 19
Ductwork installation project 20
Ductwork installation project 21
Post-construction cleaning on a commercial site — Takeair Ltd London

Cleaning

Post-construction, sparkle, and ongoing site cleaning teams.

Builders cleans, sparkle cleans, deep cleaning, and regular site cleaning for handover-ready commercial and residential projects across London.

View all photos Close gallery
Cleaning project 1
Cleaning project 2
Cleaning project 3
Cleaning project 4
Cleaning project 5
Cleaning project 6
Cleaning project 7
Cleaning project 8
Cleaning project 9
Cleaning project 10
Cleaning project 11
Cleaning project 12
Cleaning project 13
Cleaning project 14
Cleaning project 15
Cleaning project 16
Cleaning project 17
Cleaning project 18
Cleaning project 19
Cleaning project 20
Cleaning project 21
Cleaning project 22
Cleaning project 23
Cleaning project 24
Cleaning project 25
Cleaning project 26
Cleaning project 27
Cleaning project 28
Cleaning project 29

Like what you see?

Need similar work on your project?

Call us with the requirement and we will confirm availability, pricing, and the right team for the job.

Call now Get a quote